Custom Multi-Spindle Torque Tube for a Wheel Assembly

Related Industries:

,

The client was seeking an ergonomic solution to enable operators to efficiently tighten multiple nuts simultaneously and apply the correct torque during the wheel hub assembly process for a bus.

GCI engineered a custom 5-spindle torque tube to enhance process efficiency and operator safety. The torque tube is mounted on an overhead bridge and crane system, expanding the coverage area for accessing assembly points. Vertical travel is powered by a lift cylinder, and a manual roll assists the operator in aligning the tools with the bolts. A visual display aids the process by indicating when each tool has applied the correct torque to each nut.

Project Details

Maximum Capacity:

675 NM

youtube-video-thumbnail
Subscribe to the GCI channel

Are you working on a similar project? Do you have questions?

Related Material Handling & Torque Reaction Solutions

Mobile industrial manipulator for cabinet handling

Mobile Vacuum Cabinet Handler

Door manipulator arm

Door Handling Manipulator Arm

12182452C-EoH-vacuum-handler-for-vehicle-oil-pan_

Hook-mounted Custom Vacuum Gripper for Vehicle Oil Pans

Industrial manipulator for handling roll spindles

Paper Roll Spindle Handling Manipulator

Interested In Our Solutions?

Scroll to Top